Contractors are required to complete and submit District Form R8-2009-0003, De Minimus Waste Discharge Report, to the District Engineering Department within 24-hours of discharging waste water to the storm drain system for water-related construction.  

Click on the link to view or download the file.

De Minimus Waste Discharge Report